Cleveland–Delano Resources

The Project

The Cleveland–Delano District

A consolidated, historic silver-polymetallic district in Nevada's Basin and Range — repositioned as a modern, district-scale exploration opportunity.

Overview

A district with history, consolidated for modern exploration

Set in the Delano Mountains of Elko County, Nevada, the Cleveland–Delano district saw silver-polymetallic production in the early 1900s from underground workings at the Cleveland, Delano, Gold Note, and 86 mines. Like many districts of its era, work stopped for reasons unrelated to geology — metal prices, capital, and the limits of the technology of the day.

Cleveland–Delano Resources has consolidated the core of the historic district into a single land position for the first time in decades. That consolidation, combined with modern geophysics and structural interpretation, allows the district to be evaluated as one coherent mineral system rather than a patchwork of isolated prospects.

The project is exploration-stage. No mineral resource or reserve has been declared; the opportunity lies in systematically testing an interpreted target framework with modern methods.

81

Valid claims

~1,445

Acres

2021–25

Staged consolidation

Elko County

Nevada, USA

Ag-led

Pb·Zn·Sb upside

Pre-drill

Exploration stage

Location & Land Package

Positioned in a proven mining state

Nevada offers clear permitting pathways, established service infrastructure, and a deep pool of technical talent — meaningful advantages at the exploration stage.

Cleveland–Delano district location map, northeastern Elko County, Nevada
Basin and Range terrain across the project area

The current land package includes 81 valid claims covering approximately 1,445 acres across the interpreted system, consolidated in stages — most CLV claims located April–June 2025, with one Cleveland claim dating to 2021. Claim schedules and supporting documentation are available in the data room.

District Evolution

From historic workings to a modern exploration framework

  1. 01

    Discovery & early production — early 1900s

    Underground mining of silver-polymetallic structures at the Cleveland, Delano, Gold Note, and 86 mines. Smelter settlement records — including a 1922 receipt preserved in the archive — document ore shipments from the district.

  2. 02

    Dormancy — mid-20th century

    Activity wound down amid depressed metal prices and fragmented ownership. The district saw only intermittent, localized work for decades.

  3. 03

    Consolidation & expansion — CDR

    The historic core and surrounding ground were assembled in stages into a single position — 81 valid claims across ~1,445 acres, with most CLV claims located April–June 2025 and one Cleveland claim dating to 2021.

  4. 04

    Modern geophysics & interpretation — 2026

    The 2026 drone magnetic survey — 599 line-km and 143,636 readings — with structural interpretation produced the first modern, integrated picture of the mineral system.

  5. 05

    Next: systematic target testing

    Technical review, target ranking, and preparation for a disciplined drill-testing program of the interpreted framework.

1922 smelter settlement receipt

From the Project Archive

Underground survey sheets, production-era smelter receipts, and historic district mapping are preserved in the project archive — primary documents that anchor the district's history. Full scans are available in the data room.

Independent Validation

Six decades of third-party work reduce geological guesswork

Academic, governmental, and major-operator reviews converge on the same district-scale model — and large portions of the system remain untested by modern drilling.

  1. 1900s

    Historic production & smelter records

    Documented silver-polymetallic production from multiple mine areas, with smelter settlement receipts preserved as third-party evidence of the district's metal endowment.

  2. 1960

    Olsen PhD thesis

    Academic documentation of replacement geometry and the district structural framework.

  3. 1980

    Nevada Bureau of Mines district report

    Delano district reporting corroborates the system-wide carbonate replacement interpretation.

  4. '80s

    Noranda technical evaluations

    Institutional-operator mapping, underground drifting, and systematic sampling across the district — corroborating the structural and geological framework that guides current targeting.

  5. 2026

    Modern geophysics & interpretation

    The 599 line-km drone magnetic survey integrates the legacy record into one modern, district-scale target framework.

Six decades of independent review — academic, governmental, and major-operator — converge on the same district-scale model.

And large portions of the system remain untested by modern drilling.

Source documents — the Olsen thesis, Nevada Bureau of Mines reporting, Noranda-era mapping, and smelter records — are available to qualified investors in the data room.

All historical data is interpretive in nature and does not constitute a mineral resource or reserve estimate.

On the Ground

The district today

Outcropping alteration, accessible historic workings, and classic Basin and Range terrain.

Silicified outcrop in the district
Outcropping ridge within the land package
Open stope at the historic Cleveland workings

Go Deeper

The technical picture, in the data room

Claim maps, acreage schedules, historic records, and the full technical memorandum are available to qualified investors.

Request Data Room Access